User Tools

Site Tools


fuel_opnfv:news_wp1_concluded

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
fuel_opnfv:news_wp1_concluded [2015/11/14 22:33]
Jonas Bjurel
fuel_opnfv:news_wp1_concluded [2015/11/14 22:39] (current)
Jonas Bjurel
Line 1: Line 1:
 ===== Fuel@OPNFV Brahmaputra Work-package 1 concluded ===== ===== Fuel@OPNFV Brahmaputra Work-package 1 concluded =====
-**On Friday November 13 2016, collaborative OPNV project teams-, contributors-,​ as well as the OPNFV@Fuel ​are proud to announce that Fuel@OPNFV WP1 is concluded**+**On this sad Friday November 13 2016, collaborative OPNV project teams-, contributors-,​ as well as the OPNFV@Fuel ​team wants to announce that Fuel@OPNFV WP1 is concluded**
  
-This first work-package is in part aligned with Genesis mandated requirements-, ​and in part a result of Genesis requirements expected to come, internal Fuel@OPNFV requirements, ​or specific collaborative integration with Fuel@OPNFV.+This first work-package is in part aligned with Genesis mandated requirements-,​ in part a result of Genesis requirements expected to come, in part due to internal Fuel@OPNFV requirements, ​and in part based on specific collaborative integration ​request ​with Fuel@OPNFV.
  
 **Following basic deliverables are part of WP1:** **Following basic deliverables are part of WP1:**
fuel_opnfv/news_wp1_concluded.1447540421.txt.gz · Last modified: 2015/11/14 22:33 by Jonas Bjurel