User Tools

Site Tools


get_started:get_started_work_environment:scenarios

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
get_started:get_started_work_environment:scenarios [2015/01/21 14:21]
Christopher Price [2 POD LinuxFoundation hosted CI & CD Cisco blade environment]
get_started:get_started_work_environment:scenarios [2015/01/21 14:42] (current)
Christopher Price [2 POD LinuxFoundation hosted CI & CD Rack Mounted environment]
Line 6: Line 6:
     2 x Compute node (to bring up/run VNFs)     2 x Compute node (to bring up/run VNFs)
     1 x Jump Server/​Landing Server in which the installer runs in a VM (FUEL/​TripleO/​Oscar)     1 x Jump Server/​Landing Server in which the installer runs in a VM (FUEL/​TripleO/​Oscar)
-  
  
-==== 5 POD LinuxFoundation hosted rack-mount development environment ==== +==== 2 POD LinuxFoundation hosted CI & CD blade environment ​- preferred ​====
-Acquisition cost - Approx 200K USD +
- +
-Lead Time to operation -  +
- +
-Power Needs - 10KW (over 2 racks) +
- +
-Running costs -  +
- +
-==== 5 POD LinuxFoundation hosted blade development environment ==== +
-Acquisition cost - Approx 200K USD +
- +
-Lead Time to operation -  +
- +
-Power Needs - 10KW (over 2 racks) +
- +
-Running costs -  +
- +
- +
-==== 5 POD Metal as a Service hosted development environment ==== +
-Acquisition cost - 0 +
- +
-Lead Time to operation -  +
- +
-Power Needs - 0 +
- +
-Running costs - Approx 12K USD/month (first year) +
- +
-==== 2 POD LinuxFoundation hosted CI & CD environment ====+
 Acquisition cost - 50K USD Acquisition cost - 50K USD
  
-Lead Time to operation - 2 weeks delivery, 1 week installation,​ 1 week infra flushing +Lead Time to operation -  2 weeks delivery, 1 week installation,​ 1 week infra flushing
  
 Power Needs - >5KW (in one rack) Power Needs - >5KW (in one rack)
  
-Running costs - +Running costs - Hosted in existing rack, (+2K USD per month, accommodated in existing infra budget)
  
-==== 2 POD LinuxFoundation hosted CI & CD Cisco blade environment ==== +Notes: ​  
-Acquisition cost - 40-50K ​USD+Limitations 2 HDD per blade, Connectivity to be via OpenVPN or equivalent, gigabit access, suitable for at least a 3 year period 
 + 
 +==== 2 POD LinuxFoundation hosted CI & CD Rack Mounted ​environment ==== 
 +Acquisition cost - 70K USD (requires a switch)
  
 Lead Time to operation -  2 weeks delivery, 1 week installation,​ 1 week infra flushing Lead Time to operation -  2 weeks delivery, 1 week installation,​ 1 week infra flushing
Line 53: Line 26:
 Power Needs - >5KW (in one rack) Power Needs - >5KW (in one rack)
  
-Running costs - Hosted in existing rack, +2K USD per month+Running costs - Hosted in existing rack, (+2K USD per month, accommodated in existing infra budget)
  
-Limitations 2 HDD per blade+Notes: ​  
 +Connectivity to be via OpenVPN or equivalent, gigabit access, suitable for at least a 3 year period
  
 +==== 2 POD Metal as a Service hosted development environment ====
 +
 +Unable to find a suitable provider with required access and no reduction in costs.
  
-==== 2 POD Metal as a Service hosted development environment ==== 
 Acquisition cost - 0 Acquisition cost - 0
  