This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision | ||
get_started:get_started_work_environment:scenarios [2015/01/21 14:33] Christopher Price [2 POD LinuxFoundation hosted CI & CD Rack Mounted environment] |
get_started:get_started_work_environment:scenarios [2015/01/21 14:42] (current) Christopher Price [2 POD LinuxFoundation hosted CI & CD Rack Mounted environment] |
||
---|---|---|---|
Line 7: | Line 7: | ||
1 x Jump Server/Landing Server in which the installer runs in a VM (FUEL/TripleO/Oscar) | 1 x Jump Server/Landing Server in which the installer runs in a VM (FUEL/TripleO/Oscar) | ||
- | + | ==== 2 POD LinuxFoundation hosted CI & CD blade environment - preferred ==== | |
- | ==== 2 POD LinuxFoundation hosted CI & CD Rack Mounted environment ==== | + | Acquisition cost - 50K USD |
- | Acquisition cost - 70K USD | + | |
Lead Time to operation - 2 weeks delivery, 1 week installation, 1 week infra flushing | Lead Time to operation - 2 weeks delivery, 1 week installation, 1 week infra flushing | ||
Line 15: | Line 14: | ||
Power Needs - >5KW (in one rack) | Power Needs - >5KW (in one rack) | ||
- | Running costs - Hosted in existing rack, +2K USD per month | + | Running costs - Hosted in existing rack, (+2K USD per month, accommodated in existing infra budget) |
Notes: | Notes: | ||
- | Connectivity to be via OpenVPN or equivalent, gigabit access, suitable for at least a 3 year period | + | Limitations 2 HDD per blade, Connectivity to be via OpenVPN or equivalent, gigabit access, suitable for at least a 3 year period |
- | ==== 2 POD LinuxFoundation hosted CI & CD Cisco blade environment ==== | + | ==== 2 POD LinuxFoundation hosted CI & CD Rack Mounted environment ==== |
- | Acquisition cost - 50K USD | + | Acquisition cost - 70K USD (requires a switch) |
Lead Time to operation - 2 weeks delivery, 1 week installation, 1 week infra flushing | Lead Time to operation - 2 weeks delivery, 1 week installation, 1 week infra flushing | ||
Line 27: | Line 26: | ||
Power Needs - >5KW (in one rack) | Power Needs - >5KW (in one rack) | ||
- | Running costs - Hosted in existing rack, +2K USD per month | + | Running costs - Hosted in existing rack, (+2K USD per month, accommodated in existing infra budget) |
Notes: | Notes: | ||
- | Limitations 2 HDD per blade, Connectivity to be via OpenVPN or equivalent, gigabit access, suitable for at least a 3 year period | + | Connectivity to be via OpenVPN or equivalent, gigabit access, suitable for at least a 3 year period |
==== 2 POD Metal as a Service hosted development environment ==== | ==== 2 POD Metal as a Service hosted development environment ==== |