This is an old revision of the document!
Date and Time
: PST 8:00am / UTC 16:00, Friday January 22, 2015Chair
: Bin Hu (AT&T)Participants
:
Bin gave an overall update of B release status based on daily scrum. Basically:
- Installers:
. Code freeze not achieved yet as of now.\\ . Apex and Joid are ready for code freeze. Some bug fixes and integration with Contrail are still ongoing (due to dependency on some Python packages). RedHat (Dan R) and Contrail (Stuart M) are working on it\\ . Fuel needs more time to get it ready.\\ . Compass unknown.\\
- FuncTest and YardStick:
. FuncTest had several stable runs in the past 24 hours. But the stability of result is an issue. Orange POD 91% ok, and Intel POD 35% ok.\\ . Different ODL package has different result (depending on ODL version)\\ . Yardstick still troubleshooting ODL scenarios (no successful run yet).\\
Depending on how well those issues will be solved in the next a few days, Debra needs to give a report to TSC on Tuesday, and we can imagine a debate on TSC. So there is a possibility of postponing B release.
Meeting adjourned.