User Tools

Site Tools


opnfv_test_and_performance_group_meeting_minutes_10-23-2014

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Next revision
Previous revision
opnfv_test_and_performance_group_meeting_minutes_10-23-2014 [2014/10/24 16:15]
Palani Chinnakannan created
opnfv_test_and_performance_group_meeting_minutes_10-23-2014 [2014/10/24 16:19] (current)
Palani Chinnakannan [Platform Tooling]
Line 3: Line 3:
 Every Thursday 2 PM to 3 PM GMT/​UTC ​ (till end of October) Every Thursday 2 PM to 3 PM GMT/​UTC ​ (till end of October)
 Every  Thursday 3 PM to 4 PM GMT/​UTC ​ (From November) Every  Thursday 3 PM to 4 PM GMT/​UTC ​ (From November)
-GoTo Meeting Hosting Link will be posted at  ​__https://​wiki.opnfv.org/​integration_testing_projects__+GoTo Meeting Hosting Link will be posted at  ​https://​wiki.opnfv.org/​integration_testing_projects
 Trevor C will Host the Meeting and Prepare the weekly Agenda with inputs from the rest of the team Trevor C will Host the Meeting and Prepare the weekly Agenda with inputs from the rest of the team
 Palani C will be scribe Palani C will be scribe
Line 9: Line 9:
 ==== Wiki Link ==== ==== Wiki Link ====
 Groups wiki Link: https://​wiki.opnfv.org/​integration_testing_projects Groups wiki Link: https://​wiki.opnfv.org/​integration_testing_projects
-Clean up the Wiki page for Test and Performance group as discussed:  ​__**AI Morgan R**__+Clean up the Wiki page for Test and Performance group as discussed: ​ **AI Morgan R**
  
 ==== Testbed Governance and Policy Subgroup ==== ==== Testbed Governance and Policy Subgroup ====
- The policy wiki page should cover mandatory elements like reservation tables, test bed usage table, ​ Access info table etc.,  AI: Morgan R+ The policy wiki page should cover mandatory elements like reservation tables, test bed usage table, ​ Access info table etc.,  ​**AI: Morgan R** 
 Morgan, Cindy and Chris to meet and discuss the policies and experiences of cable labs lab hosting environment.,​ Morgan, Cindy and Chris to meet and discuss the policies and experiences of cable labs lab hosting environment.,​
 ==== H/W and Software Definition sub group ==== ==== H/W and Software Definition sub group ====
-Investigate on using High speed links (1Gbps +) for connectivity from/to Internet.  ​__**AI Trevor C, Pranav M**__ +Investigate on using High speed links (1Gbps +) for connectivity from/to Internet. ​ **AI Trevor C, Pranav M**
-Post the software items in the Wiki Link for People to comment and/or add additional items. ​__**AI: Trevor**__ + 
 +Post the software items in the Wiki Link for People to comment and/or add additional items. **AI: Trevor**
 ==== Platform Tooling ==== ==== Platform Tooling ====
 Add the testbed and tooling Infrastructure list of categories (slide 4) to the wiki, include a list of selected s/w, tools. ​ __**AI: Wenjing C**__ Add the testbed and tooling Infrastructure list of categories (slide 4) to the wiki, include a list of selected s/w, tools. ​ __**AI: Wenjing C**__
 +
 Team to comment on this link to include their needed tools, VNF etc. Team to comment on this link to include their needed tools, VNF etc.
 ==== VNF Deployment Test Cases ==== ==== VNF Deployment Test Cases ====
-Change Integration Testing to OPNFV  Platform Functional Testing. ​ __**AI: Palani C**__+Change Integration Testing to OPNFV  Platform Functional Testing. **AI: Palani C**
  
opnfv_test_and_performance_group_meeting_minutes_10-23-2014.1414167314.txt.gz · Last modified: 2014/10/24 16:15 by Palani Chinnakannan