User Tools

Site Tools


pharos:pharos_policies

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Next revision
Previous revision
pharos:pharos_policies [2015/05/05 00:09]
Trevor Cooper created
— (current)
Line 1: Line 1:
- 
- 
- 
-This laboratory is a controlled environment made available to OPNFV community members by Orange for improving OPNFV solution and testing interoperability with other manufacturers’ equipment for the OPNFV community. ​ 
- 
-This testing gives community members the advantages of working together to test interoperability. ​ 
- 
-Access to the laboratory is granted by the laboratory administrator. The procedure to get credentials,​ the documentation (architecture,​ user guide), the testbed inventory (hardware, bare metal capabilities,​ available tooling) and the local policy (physical access, specific code of conduct) are described in the page below. 
- 
-Members are encouraged to share as many results as possible. The results of community tests would be collected into the Pharos dashboard. The Pharos project will disseminate the test results so any testbed of the federation could replay and consolidate test campaigns ​ with different combination of hardware/​software. 
- 
-Specific tests by members using proprietary components to help improving the overall quality of the OPNFV solution are possible. Members participating in such interoperability event, dry run, practice run, certification wave, wave rehearsals must not (either before, during or after the scheduled development lab use or interoperability event, dry run, practice run, certification wave, wave rehearsal or while performing daily tasks at any of Orange test development laboratories):​ 
-  * Access any other members’ equipment or other facilities at Orange without expressed written permission from an authorized Orange’ project manager. 
-  * Discuss any other members information and/or interoperability problems with third parties or the press without Orange’ prior written authorization. 
-  * Reveal other members’ test results, either directly or implicitly, to his/her own company, third parties or the press. 
-  * Share or copy confidential information or intellectual property other than in accordance with the applicable OPNFV policy. 
- 
-Testing resources reservation shall be managed at the testbed level by the testbed administrator. The TSC may re-prioritize test campaigns if necessary. 
  
pharos/pharos_policies.1430784585.txt.gz · Last modified: 2015/05/05 00:09 by Trevor Cooper