Project Name:

  • Proposed name for the project: Platform tooling
  • Proposed name for the repository: repo-name
  • Project Categories: (Documentation, Requirements, Integration & Testing, Collaborative Development)

Project description:

  • High level description of test bed tooling and infrastructure project. We are to support these goals:
  1. provide a documented baseline using release candidates of opnfv hw/sw ingredients
  2. release testing of OPNFV's official releases
  3. provide a "sandbox" for developer testing
  • Include any architecture diagrams or specifications
  1. The first diagram shows a high level working model for release testing and how this project may interact with other projects

Scope:

  • Describe the problem being solved by project
  1. support both micro/macro level testing, virtual infrastructure level or VNFC or VNF level testing
  2. can host multi-origin/multi-vendor VNFs, i.e. compositions of vnfc's
  3. support regression, functional, and performance/benchmark testing
  4. covers both hw and sw components

The test bed tooling functionality will cover:

  1. Access tools: ID/authentication
  2. Access tools: Web access
  3. Access tools: Console access
  4. Access tools: Reservation / multi-user/tenant
  5. On-boarding of vnf/vnfc tools
  6. Test automation tools
  7. Diagnostic, logging, monitoring tools
  8. Test load generators, benchmark tools: sw, hw
  9. Test VNFs, target or auxiliary
  10. inter-testbed connectivity emulation, if needed
  11. stand-alone nfvc connectivity emulation, if needed
  12. documentation, api reference, test reports
  • Specify any interface/API specification proposed

The following diagram shows the high level reference of the test beds and view of the interfaces:

  • Specify testing and integration:

Release candidates are delivered from CI project. We need to work out a release candidate cadence in practice to (i) have stability of the test bed for developers who are rely on a stable environment, and (ii) meet the need of testing the latest release candidate. A suitable cadence needs to be worked out, or a rolling scheme.

  • Debugging and Tracing

Debugging and tracing are part of main deliverables for all in scope testing.

  • Unit/Integration Test plans

Test plans of platform level and tool level instrumentation will be covered in this project. It is assumed that a sister VNF test case project will produce higher level use cases.

  • Client tools developed for status shows etc.

Covered in this project includes tools that may go to a developer's client, e.g. for emulation of certain network connectivity. Most of other "client" tools may be supported with web UI.

  • Identity a list of features and functionality will be developed.
  • Identify what is in or out of scope. So during the development phase, it helps reduce discussion.
  • Describe how the project is extensible in future

Testability: ''(optional, Project Categories: Integration & Testing)''

  • Specify testing and integration like interoperability, scalability, high availablity
  • What QA and test resources will be available?

Documentation: ''(optional, Project Categories: Documention)''

  • API Docs
  • Functional block description

Dependencies:

  • Identify similar projects is underway or being proposed in OPNFV or upstream project
  • Identify any open source upstream projects and release timeline.
  • Identify any specific development be staged with respect to the upstream project and releases.
  • Are there any external fora or standard development organization dependencies. If possible, list and informative and normative reference specifications.
  • If project is an integration and test, identify hardware dependency.

Committers and Contributors:

  • Name of and affiliation of the maintainer: Wenjing Chu (Dell)
  • Names and affiliations of the committers
  • Any other contributors

Planned deliverables

  • Described the project release package as OPNFV or open source upstream projects.
  • If project deliverables have multiple dependencies across other project categories, described linkage of the deliverables.

Proposed Release Schedule:

  • When is the first release planned?

This will be part of the first release.

  • Will this align with the current release cadence?

Yes.