User Tools

Site Tools


plugfest:test_plan_proposal

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
Last revision Both sides next revision
plugfest:test_plan_proposal [2016/02/07 00:12]
Bin Hu [Target Specific Use Cases]
plugfest:test_plan_proposal [2016/02/10 15:01]
Lincoln Lavoie added an "about this page"
Line 1: Line 1:
 ===== Test Plan Proposal ===== ===== Test Plan Proposal =====
 +==== About this Page ====
 +The content below is intended as a sandbox / idea-pad for potential plugfest test cases. ​ The final / formal test plans will be captured in the DoveTail repository, allowing for continued development between test events.
  
 ==== Device Under Test (DUT) ==== ==== Device Under Test (DUT) ====
  
-=== DUT #1 ===+=== DUT #1 (Does an OPNFV Brahmaputra scenario deploy on a new set of hardware?​) ​===
  
 Testing OPNFV (or OPNFV-derived commercial product) Installation Process with SDN Integration on Bare Metal Device Testing OPNFV (or OPNFV-derived commercial product) Installation Process with SDN Integration on Bare Metal Device
Line 19: Line 21:
     * os-opencontrail-nofeature-ha     * os-opencontrail-nofeature-ha
  
-=== DUT #2 ===+=== DUT #2 (Does my VNF XYZ run on a specific scenario?​) ​===
  
-Testing ​interoperability ​of life-cycle management functions / infrastructure ​against OPNFV platform+  * Testing ​the ability of bringing up one or a set of VNFs against ​one or more Scenarios of OPNFV platform 
- +  * Testing the ability of shutting down one or a set of VNFs against one or more Scenarios of OPNFV platform 
-  * All about  management plane +  * Testing the ability of state transition of one VNF against one or more Scenarios of OPNFV platform
-  * Baseline with **null** ​VNF +
-  * VNF Integration+
  
 **Note**: testing of VNF itself is out of scope **Note**: testing of VNF itself is out of scope
  
-=== DUT #3 ===+=== DUT #3 (a new scenario, i.e. a new mix of new components, their configuration and hardware etc.) ===
  
 Testing interoperability of other network elements against OPNFV platform: Testing interoperability of other network elements against OPNFV platform:
Line 36: Line 36:
   * Baseline with well known/​proven equipment (a switch, a router, ???)   * Baseline with well known/​proven equipment (a switch, a router, ???)
  
-=== DUT #4 ===+=== DUT #4 (a use case on top of a new mix of new components, their configuration and hardware etc.) ===
  
 Testing interoperability of Specific Use Cases and Capabilities Testing interoperability of Specific Use Cases and Capabilities
Line 78: Line 78:
 TBD TBD
  
 +==== Template of Test Case Definition ====
 +
 +Click {{:​plugfest:​test_case_formatting.docx|here}} to download the template of test case definition.
plugfest/test_plan_proposal.txt · Last modified: 2016/02/26 14:23 by Bin Hu