User Tools

Site Tools


release_c_planning:priority_list

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
release_c_planning:priority_list [2016/03/07 17:42]
Thomas F Herbert
release_c_planning:priority_list [2016/03/15 19:47] (current)
Al Morton [Table]
Line 30: Line 30:
 ---- ----
  
-^ Feature ​ ^Description |Priority ​  ​| Effort ​ | Impact ​ |Jira   ​| Comments ​ +^ Feature ​                                    ​^ Description ​                                      ​| Priority ​ | Effort ​ | Impact ​ | Jira  | Comments ​                                        ​
-| **Apex Feature List** ​   ​  ​  ​  ​  ​  ​+| **Apex Feature List** ​                      ​                                                  ​          ​        ​        ​      ​                                                 
-| Functest successful run with clean results ​  ​needs to run sucessfully as it validates the build (functional ​results)  ​| High   XL | High    ​  ​+| Functest successful run with clean results ​ Successful completion with reported ​results.      ​| High           XL | High          ​                                                 
-| Yardstick Sucessful run with clean results ​  ​|will provide performance ​results ​   | High  | XL  | High    ​  ​+| Yardstick Sucessful run with clean results ​ Successful completion with reported ​results.      ​| High      | XL      | High          ​                                                 
-OS and ODL integration ​ |   ​  ​  ​  ​|   ​| ​  ​|+Apex Consume ovs4opnfv generated RPM        | Define Deployment options for DPDK and non-DPDK. ​ |           ​| ​        ​| ​        ​| ​      | Work with Apex for successful ​integration ​(TFH)  | 
 +NSH for vxLan        ​NSH/vLAN available for DPDK and non-DPDK.  ​   ​High ​      |   XL      ​    High    ​      | Integrate and Test  | 
  
 ---- ----
  
-^ Feature ​                                | Description ​                                                                                                ​^  Priority |  Effort | Impact ​ | Jira  | Comments ​                                           +^ Feature ​                                | Description ​                                                                                                                                                                                                                        ​^  Priority |  Effort | Impact ​ | Jira  | Comments ​                                                                     
-| ** OVS Feature List** ​                  ​| ​                                                                                                            ​|           ​| ​        ​| ​        ​| ​      ​| ​                                                    ​+| ** OVS Feature List** ​                  ​| ​                                                                                                                                                                                                                                    ​|           ​| ​        ​| ​        ​| ​      ​| ​                                                                              ​
-| OVS Performance (Requested by Bin, Hu)  | need to set expectations based on Use Cases                                                                 ​| High      |         ​| ​        ​| ​      ​| ​ follow up meeting to be scheduled( 1 hour session) | +| OVS Performance (Requested by Bin, Hu)  | need to set expectations based on Use Cases                                                                                                                                                                                         ​| High      |         ​| ​        ​| ​      ​| ​                           follow up meeting to be scheduled( 1 hour session) | 
-| Priority Path through OVS               | scheduling priority packets before others, ​OVS may not be the right place for it                            ​| High      |         ​| ​        ​| ​      ​| ​ follow up meeting ​to be scheduled1 hour session) | +| Priority Path through OVS               | scheduling priority packets before others. Dataplane Approaches include NIC queuesmulti-queue at guest interface, and multiple guest interfaces. Control plane approach involves Auxiliary control connections to OF controller.  ​| High      |         ​| ​        ​| ​      ​| ​ follow up meeting ​at Hackfest ​(Marchproduces current list of alternatives. ​
-| NSH Requirement ​                        | Happening independent of us, we need to ensure its reflected in OPNFV                                       ​| Low       ​| ​        ​| ​        ​| ​      ​| ​                                                    ​+| NSH Requirement ​                        | Happening independent of us, we need to ensure its reflected in OPNFV                                                                                                                                                               ​| Low       ​| ​        ​| ​        ​| ​      ​| ​                                                                              ​
-| MPLS over GRE                           ​| ​ Specific requirement brought up by Ericsson but is being worked on by someone else, need to get link to it |Low |         ​| ​        ​| ​      ​| ​                                                    ​+| MPLS over GRE                           ​| ​                                                                                                                         Specific requirement brought up by Ericsson but is being worked on by someone else, need to get link to it | Low       ​|         ​| ​        ​| ​      ​| ​                                                                              ​
-| 100G Requirement ​                       |                                                                                                             ​|           ​| ​        ​| ​        ​| ​      ​| ​                                                    ​+| 100G Requirement ​                       |                                                                                                                                                                                                                                     ​|           ​| ​        ​| ​        ​| ​      ​| ​                                                                              ​
-| Virtio Container requirement ​           |                                                                                                             ​|           ​| ​        ​| ​        ​| ​      ​| ​                                                    ​+| Virtio Container requirement ​           |                                                                                                                                                                                                                                     ​|           ​| ​        ​| ​        ​| ​      ​| ​                                                                              ​
-| Port Placement on Cores                 ​| ​                                                                                                            ​|           ​| ​        ​| ​        ​| ​      ​| ​                                                    ​|+| Port Placement on Cores                 ​| ​                                                                                                                                                                                                                                    ​|           ​| ​        ​| ​        ​| ​      ​| ​                                                                              ​| 
 + 
 + 
 + 
 +---- 
 + 
 +^ Feature ​                               ^ Description ​                                          | Priority ​ | Effort ​ | Impact ​ | Jira  | Comments ​                                          | 
 +| **JOID Feature List** ​                 |                                                       ​| ​          ​| ​        ​| ​        ​| ​      ​| ​                                                   | 
 +| Functest successful run with results ​  | Successful completion with reported results. ​         | High      |      XL | High    |       ​| ​                                                   | 
 +| Yardstick Successful run with results ​ | Successful completion with reported results. ​         | High      | XL      | High    |       ​| ​                                                   | 
 +| JOID support with DPDK                 | Define Deployment options for DPDK                    |           ​| ​        ​| ​        ​| ​      | Work with JOID to integreted DPDK                  | 
 +| Support for Power8 architecture ​       | Define Deployment options for different architecture ​ |           ​| ​        ​| ​        ​| ​      | Work with JOID to integreted power8 architecture. ​ | 
 + 
 + 
  
release_c_planning/priority_list.1457372543.txt.gz · Last modified: 2016/03/07 17:42 by Thomas F Herbert