User Tools

Site Tools


release_c_planning:priority_list

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
release_c_planning:priority_list [2016/03/07 17:50]
Thomas F Herbert [Table]
release_c_planning:priority_list [2016/03/15 19:47] (current)
Al Morton [Table]
Line 35: Line 35:
 | Yardstick Sucessful run with clean results ​ | Successful completion with reported results. ​     | High      | XL      | High    |       ​| ​                                                 | | Yardstick Sucessful run with clean results ​ | Successful completion with reported results. ​     | High      | XL      | High    |       ​| ​                                                 |
 | Apex Consume ovs4opnfv generated RPM        | Define Deployment options for DPDK and non-DPDK. ​ |           ​| ​        ​| ​        ​| ​      | Work with Apex for successful integration (TFH)  | | Apex Consume ovs4opnfv generated RPM        | Define Deployment options for DPDK and non-DPDK. ​ |           ​| ​        ​| ​        ​| ​      | Work with Apex for successful integration (TFH)  |
 +| NSH for vxLan        | NSH/vLAN available for DPDK and non-DPDK. ​ |    High       ​| ​  ​XL ​     |     ​High ​   |       | Integrate and Test  |
 +
 +
 +----
 +
 +^ Feature ​                                | Description ​                                                                                                                                                                                                                        ​^ ​ Priority |  Effort | Impact ​ | Jira  | Comments ​                                                                     |
 +| ** OVS Feature List** ​                  ​| ​                                                                                                                                                                                                                                    ​| ​          ​| ​        ​| ​        ​| ​      ​| ​                                                                              |
 +| OVS Performance (Requested by Bin, Hu)  | need to set expectations based on Use Cases                                                                                                                                                                                         | High      |         ​| ​        ​| ​      ​| ​                           follow up meeting to be scheduled( 1 hour session) |
 +| Priority Path through OVS               | scheduling priority packets before others. Dataplane Approaches include NIC queues, multi-queue at guest interface, and multiple guest interfaces. Control plane approach involves Auxiliary control connections to OF controller. ​ | High      |         ​| ​        ​| ​      ​| ​ follow up meeting at Hackfest (March) produces current list of alternatives. |
 +| NSH Requirement ​                        | Happening independent of us, we need to ensure its reflected in OPNFV                                                                                                                                                               | Low       ​| ​        ​| ​        ​| ​      ​| ​                                                                              |
 +| MPLS over GRE                           ​| ​                                                                                                                         Specific requirement brought up by Ericsson but is being worked on by someone else, need to get link to it | Low       ​| ​        ​| ​        ​| ​      ​| ​                                                                              |
 +| 100G Requirement ​                       |                                                                                                                                                                                                                                     ​| ​          ​| ​        ​| ​        ​| ​      ​| ​                                                                              |
 +| Virtio Container requirement ​           |                                                                                                                                                                                                                                     ​| ​          ​| ​        ​| ​        ​| ​      ​| ​                                                                              |
 +| Port Placement on Cores                 ​| ​                                                                                                                                                                                                                                    ​| ​          ​| ​        ​| ​        ​| ​      ​| ​                                                                              |
  
  
Line 40: Line 54:
 ---- ----
  
-^ Feature ​                                | Description ​                                                                                                 ​Priority ​|  Effort | Impact ​ | Jira  | Comments ​                                           +^ Feature ​                               Description ​                                          Priority ​ Effort ​ | Impact ​ | Jira  | Comments ​                                          ​
-| ** OVS Feature List** ​                  ​                                                                                                            ​|           ​| ​        ​| ​        ​| ​      ​| ​                                                    ​+| **JOID Feature List** ​                                                                       ​|           ​| ​        ​| ​        ​| ​      ​| ​                                                   
-OVS Performance (Requested by Bin, Hu)  ​need to set expectations based on Use Cases                                                                 | High      |         ​        ​|       ​| ​ ​follow up meeting to be scheduled( 1 hour session) ​+Functest successful run with results ​  Successful completion with reported results. ​         ​| High      |      ​XL ​High    ​|       ​| ​                                                   
-Priority Path through OVS               scheduling priority packets before others, OVS may not be the right place for it                            ​| High      |         ​        ​|       ​| ​ ​follow up meeting to be scheduled( 1 hour session) ​+Yardstick Successful run with results  ​Successful completion with reported results. ​         ​| High      | XL      ​High    ​|       ​| ​                                                   
-NSH Requirement ​                        Happening independent of us, we need to ensure its reflected in OPNFV                                       Low       |         ​| ​        ​| ​      ​| ​                                                    ​+JOID support with DPDK                 Define Deployment options for DPDK                    ​          ​|         ​| ​        ​| ​      ​| ​Work with JOID to integreted DPDK                  ​
-MPLS over GRE                           |  ​Specific requirement brought up by Ericsson but is being worked on by someone else, need to get link to it |Low |         ​| ​        ​| ​      ​| ​                                                    | +Support for Power8 architecture ​       ​Define Deployment options for different architecture ​ ​| ​          ​| ​        ​| ​        ​| ​      ​| ​Work with JOID to integreted power8 architecture.  ​
-| 100G Requirement ​                       |                                                                                                             |           ​| ​        ​| ​        ​| ​      ​| ​                                                    ​+ 
-| Virtio Container requirement ​           |                                                                                                             ​| ​          ​| ​        ​| ​        ​| ​      ​| ​                                                    | + 
-| Port Placement on Cores                 ​| ​                                                                                                            ​| ​          ​| ​        ​| ​        ​| ​      ​| ​                                                    |+
  
release_c_planning/priority_list.1457373001.txt.gz · Last modified: 2016/03/07 17:50 by Thomas F Herbert