 1. Has your feature been executed on an OPNFV deployment in a Pharos lab? y/n 1. Has your feature been executed on an OPNFV deployment in a Pharos lab? y/n
 +
 +Yes, because it is deployed in Huawei’s lab. It is manual deployment, not an “OPNFV deployment” per se. I would expect that:
 +  * Huawei will use Compass to deploy it based on their experience of manual deployment, including the scenario of disabling odl-l3 and enabling neutron-l3-agent
 +  * Other installers will at least let us know the configuration change that is needed for our [[http://​wiki.opnfv.org/​brahmaputra_testing_page?&#​test_scenarios_for_brahmaputra.|Deployment Scenarios]] **A3** and **A4**.
  
 2. Have your test cases been run on the feature once deployed in a Pharos lab? y/n 2. Have your test cases been run on the feature once deployed in a Pharos lab? y/n
 +
 +Yes. It was done manually. Huawei is developing Yardstick code to automate the tests.
  
 3. Are your test cases all ready? y/n 3. Are your test cases all ready? y/n
 +
 +Yes
  
 4. Are your test cases all passing? y/n 4. Are your test cases all passing? y/n
 +
 +Yes
  
 5. Do you feel you are prepared for code freeze on January 5th? y/n 5. Do you feel you are prepared for code freeze on January 5th? y/n
 +
 +Yes except Installer related and Yardstick test related
  
 6. Have all known open issues (Jira tickets against your project) been documented and that documentation either integrated into the release or made available on a public page and pointed to through documents that are integrated into the release? y/n 6. Have all known open issues (Jira tickets against your project) been documented and that documentation either integrated into the release or made available on a public page and pointed to through documents that are integrated into the release? y/n
 +
 +N/A. We don’t have open issues. All Jira issues are either closed or in progress (community lab deployment, testing and documentation) which are expected to resolve and close before B release.
  
 7. Are all known open issues (Jira Tickets) prioritized by severity of impact (critical, high, medium, low) to users?y/n 7. Are all known open issues (Jira Tickets) prioritized by severity of impact (critical, high, medium, low) to users?y/n
 +
 +N/A. We don’t have open issues. All Jira issues are either closed or in progress (community lab deployment, testing and documentation) which are expected to resolve and close before B release.
  
 8. All known open critical Jira Tickets have been closed or have a workaround in place?y/n 8. All known open critical Jira Tickets have been closed or have a workaround in place?y/n
 +
 +Yes
  
 9. Do all non-critical Jira Tickets have a planned disposition in place (ie. deferred-fix in later release or closed- won't fix)?y/n 9. Do all non-critical Jira Tickets have a planned disposition in place (ie. deferred-fix in later release or closed- won't fix)?y/n
 +
 +Yes
  
 10. Is your documentation complete and checked in? If not, how do you plan to deliver it independent of the release? 10. Is your documentation complete and checked in? If not, how do you plan to deliver it independent of the release?
 +
 +Yes. All draft complete:
 +  * [[http://​artifacts.opnfv.org/​ipv6/​docs/​setupservicevm/​index.html|Draft of Install Guide (HTML)]]
 +  * [[http://​artifacts.opnfv.org/​ipv6/​docs/​setupservicevm/​setupservicevm.pdf|Draft of Install Guide (PDF)]]
 +  * [[http://​artifacts.opnfv.org/​ipv6/​docs/​gapanalysis/​index.html|Draft of Gap Analysis/​User Guide (HTML)]]
 +  * [[http://​artifacts.opnfv.org/​ipv6/​docs/​gapanalysis/​gapanalysis.pdf|Draft of Gap Analysis/​User Guide (PDF)]]
 +