User Tools

Site Tools


releases:brahmaputra:release_plan:yardstick_milestone_d_report

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
releases:brahmaputra:release_plan:yardstick_milestone_d_report [2015/11/30 08:58]
Ana Cunha
releases:brahmaputra:release_plan:yardstick_milestone_d_report [2015/11/30 09:36] (current)
Ana Cunha
Line 10: Line 10:
 |7 | Describe what you have remaining to do? (hint: You should only have completion of existing features and bug fixes to do. For test projects you will be developing remaining tests according to frozen specifications.)| Develop framework code to cater for all the test specifications;​ Set up all labs required for the tests and release, enable tests; Collect, verify and visualize test results; Documentation;​ Bug fixes| |7 | Describe what you have remaining to do? (hint: You should only have completion of existing features and bug fixes to do. For test projects you will be developing remaining tests according to frozen specifications.)| Develop framework code to cater for all the test specifications;​ Set up all labs required for the tests and release, enable tests; Collect, verify and visualize test results; Documentation;​ Bug fixes|
 |8 | How confident are you that you will be complete for Milestone E/code freeze on Jan 5? Green/​Yellow/​Red|Yellow2Red - Not all test cases, including Yardstick own test cases, will be ready by Jan 5th. | |8 | How confident are you that you will be complete for Milestone E/code freeze on Jan 5? Green/​Yellow/​Red|Yellow2Red - Not all test cases, including Yardstick own test cases, will be ready by Jan 5th. |
-|9 | List any serious or blocking issues that are impeding progress on your project| As mentioned in milestone C, need a decision (and freeze it) which labs will be used for release verification; ​Chritmas ​holidays will slow thngs down before next milestone|+|9 | List any serious or blocking issues that are impeding progress on your project| As mentioned in milestone C, need a decision (and freeze it) which labs will be used for release verification; ​Christmas ​holidays will slow things ​down before next milestone|
  
releases/brahmaputra/release_plan/yardstick_milestone_d_report.1448873906.txt.gz · Last modified: 2015/11/30 08:58 by Ana Cunha