User Tools

Site Tools


requirements_projects:escalator

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
requirements_projects:escalator [2015/03/12 10:54]
Jie Hu [Project description:]
requirements_projects:escalator [2015/04/10 07:21] (current)
Jie Hu [Committers and Contributors:]
Line 36: Line 36:
   * Describe the problem being solved by project   * Describe the problem being solved by project
     * In Telco network, a planned network/​service interruption for upgrade should be recovered in a short time. This has not been considered by the upstream projects yet.     * In Telco network, a planned network/​service interruption for upgrade should be recovered in a short time. This has not been considered by the upstream projects yet.
-    * Upgrade platform ​will leads to pay a lot of efforts on testing ​the compatible with the services / network ​entities and preventing ​the end users from big influences.   +    * Upgrade platform ​need a lot of efforts on preparation to avoid making troubles on end users accessing ​the network ​services during ​the upgrading.   
   * Specify any interface/​API specification proposed, ​   * Specify any interface/​API specification proposed, ​
-      * Nf-Vi for control ​the upgrade procedure +      * interface/​API ​for controlling ​the upgrade procedure 
-      * Vi-Vnfm ​for ensure a VNF friendly ​upgrade +      * interface/​API ​for sending notifications of the upgrade ​procedure 
-      * Oi-Vi for supporting ​the policy control from NFV Orchestrator+      * interface/​API ​for interacting with the Orchestrate or OSS
   * Specify testing and integration:​   * Specify testing and integration:​
       * TBD       * TBD
Line 55: Line 55:
       * Smooth Upgrade       * Smooth Upgrade
       * Safe Rollback       * Safe Rollback
 +  * In the scope:
 +      * Develop an use cases section for upgrade related operations to clarify the scope.
 +      * Joint work with other dependent OPNFV projects, HA, Multisite, etc.
 +      * High level requirements on the compatibility of OPNFV platform.
   * Out of scope: ​   * Out of scope: ​
       * VNF Lifecycle Management, including VNF upgrade and update       * VNF Lifecycle Management, including VNF upgrade and update
-      * Abnormal Failure of OPNFV platform 
-      * High Availability 
-      * Security 
   * Describe how the project is extensible in future   * Describe how the project is extensible in future
-      * Codes / Automaton scripts to implement related mechanisms if available in the future.+      * Architecture, ​Codes / Automaton scripts to implement related mechanisms if available in the future
 +      * Blue Prints to the upstream projects.
 ==== Testability:​ ''​(optional,​ Project Categories: Integration & Testing)''​ ==== ==== Testability:​ ''​(optional,​ Project Categories: Integration & Testing)''​ ====
  
Line 78: Line 80:
   * Identify any open source upstream projects and release timeline. ​   * Identify any open source upstream projects and release timeline. ​
     * Openstack     * Openstack
 +    * ODL
   * Identify any specific development be staged with respect to the upstream project and releases.   * Identify any specific development be staged with respect to the upstream project and releases.
     * TBD     * TBD
Line 91: Line 94:
      * Ulrich Kleber ([[Ulrich.Kleber@huawei.com]])      * Ulrich Kleber ([[Ulrich.Kleber@huawei.com]])
   * Names and affiliations of any other contributors   * Names and affiliations of any other contributors
 +     * Maria Toeroe ([[maria.toeroe@ericsson.com]])
 +     * Sama, Malla Reddy ([[sama@docomolab-euro.com]])
      * Zhong Chao ([[chao.zhong@zte.com.cn]])      * Zhong Chao ([[chao.zhong@zte.com.cn]])
      * Julien Zhang ([[zhang.jun3g@zte.com.cn]])      * Julien Zhang ([[zhang.jun3g@zte.com.cn]])
      * Yuri Yuan ([[yuan.yue@zte.com.cn]])      * Yuri Yuan ([[yuan.yue@zte.com.cn]])
 +     * Zhipeng Huang ([[huangzhipeng@huawei.com]])
      * //more contributors are welcome// ​      * //more contributors are welcome// ​
 ==== Planned deliverables ==== ==== Planned deliverables ====
requirements_projects/escalator.1426157657.txt.gz · Last modified: 2015/03/12 10:54 by Jie Hu