User Tools

Site Tools


requirements_projects:resource_scheduler

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
requirements_projects:resource_scheduler [2015/01/30 08:11]
John [Committers and Contributors:]
requirements_projects:resource_scheduler [2015/03/18 02:05] (current)
Mingjiang Li [Planned deliverables]
Line 2: Line 2:
  
   * Proposed name for the project: ''​Resource Scheduler''​   * Proposed name for the project: ''​Resource Scheduler''​
-  * Proposed name for the repository: ''​Resource Scheduler''​+  * Proposed name for the repository: ''​Conductor''​
   * Project Categories: ''​(Requirements)''​   * Project Categories: ''​(Requirements)''​
  
Line 106: Line 106:
     * Zhiqi Wang (HUAWEI: zhiqi.wang@huawei.com)     * Zhiqi Wang (HUAWEI: zhiqi.wang@huawei.com)
     * Ximing Li (HUAWEI: liximing@huawei.com)     * Ximing Li (HUAWEI: liximing@huawei.com)
-    * Qiao Fu (CMCC: fuqiao@chinamobile.com)+    * Qiao Fu (China Mobile: fuqiao@chinamobile.com) 
 +    * Hao Pang(HUAWEI:​ shamrock.pang@huawei.com) 
 +    * Yimin Wang (HUAWEI: yimin.wang@huawei.com) 
 +    * Qi Liang (HUAWEI: liangqi1@huawei.com) 
 +    * Mingjiang Li (HUAWEI: limingjiang@huawei.com)
  
    
Line 117: Line 121:
  
   * Describe the project release package as OPNFV or open source upstream projects.   * Describe the project release package as OPNFV or open source upstream projects.
-    * Ceilometer project (https://​wiki.openstack.org/​wiki/​Ceilometer ) is the upstream project ​of this projectIt would be aligned ​with OpenStack release schedule and OPNFV Release 1 schedule+    * User requirements ​of OPNFV Resource Scheduler. 
-    * Nova project (https://​wiki.openstack.org/​wiki/​Nova ) is the upstream project of this project. It would be aligned with OpenStack release schedule and OPNFV Release 1 schedule.+    * Gap analysis on Resource Scheduler ​with open source upstream projects
 +    * Propose BPs in Nova project (https://​wiki.openstack.org/​wiki/​Nova ) .
   * If project deliverables have multiple dependencies across other project categories, described linkage of the deliverables.   * If project deliverables have multiple dependencies across other project categories, described linkage of the deliverables.
-    * N/A+    * TBD
  
  
Line 126: Line 131:
  
   * When is the first release planned? ​   * When is the first release planned? ​
-    * Gap analysis is planned to be finished in OPNFV 1st release, i.e. by March, 2015.+    * Gap analysis is planned to be finished in April, 2015.
     * OPNFV resource scheduler software framework architecture (including API specification) is planned to be finished by August, 2015.     * OPNFV resource scheduler software framework architecture (including API specification) is planned to be finished by August, 2015.
   * Will this align with the current release cadence   * Will this align with the current release cadence
-    * Yes, the gap analysis will be part of OPNFV 1st release; others will be part of OPNFV 2nd release.+    * Yes.
requirements_projects/resource_scheduler.1422605463.txt.gz · Last modified: 2015/01/30 08:11 by John