This shows you the differences between two versions of the page.
Both sides previous revision Previous revision | |||
requirements_projects [2015/08/11 13:50] Ildiko Vancsa [Project lifecycle] |
requirements_projects [2015/08/11 13:53] (current) Ildiko Vancsa [Project lifecycle] |
||
---|---|---|---|
Line 31: | Line 31: | ||
==== Project lifecycle ==== | ==== Project lifecycle ==== | ||
- | High level project lifecycle for the current categories: | + | High level (sub-)project lifecycle for the current categories: |
{{ :requirements_projects:project_lifecycle_doc_image.png?600 |}} | {{ :requirements_projects:project_lifecycle_doc_image.png?600 |}} | ||
- | As you can see on the above figure the steps for each current category are the same, on high level the above mentioned categorization does not add any differentiation. On the other hand today we are not following the process of having sub-projects for the different types of activities, but we are more aiming for covering all these under the umbrella of one single project. | + | As you can see on the above figure the steps for each current category are the same, on high level the above mentioned categorization does not add any differentiation in the meaning of how we are using these terms. On the other hand today we are not following the process of having sub-projects for the different types of activities, but we are more aiming for covering all these under the umbrella of one single project. |
The categorization does not define anything about the lifecycle of the projects contained by each group either. In case of each and every project we have phases as: | The categorization does not define anything about the lifecycle of the projects contained by each group either. In case of each and every project we have phases as: |