User Tools

Site Tools


wiki:vswitch_meeting_minutes

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
wiki:vswitch_meeting_minutes [2015/01/22 13:45]
Maryam Tahhan [Jan/14/2015]
wiki:vswitch_meeting_minutes [2015/03/19 11:19] (current)
Maryam Tahhan [THIS PAGE HAS BEEN MOVED TO]
Line 1: Line 1:
-====== ​Vswitch Performance Characterization Meeting Minutes ​======+====== ​THIS PAGE HAS BEEN MOVED TO  ​====== 
 +https://​wiki.opnfv.org/​meetings/​vsperf 
 +====== Please help move this page ====== 
 +  * NOTE: Meeting info pages for each project should be moved to the ''​[[/​meetings/​|https://​wiki.opnfv.org/​meetings/​]]''​ folder. 
 +  * Do not place meeting related pages under the ''/​wiki''​ or ''/​project-name''​ folders. 
 +  * ALSO: Project info pages should not be under the ''/​wiki''​ folder.  
 +  * Project related pages should be located under the ''/''​ (root) folder. 
 +  * To move your page you should create a new page and update this one with a note stating it has been moved.
  
  
 ---- ----
 +
 +====== vSwitch Performance Characterization Meeting Minutes ======
 +
 +
 +----
 +
 +==== Feb/11/2015 ====
 +**Mailing List**
 +
 +  * We won't be able to setup a separate mailing list, however we have setup a topic (vswitchperf) under the OPNFV tech discuss mailing list that people can subscribe to.
 +  * This info is available on the project wiki https://​wiki.opnfv.org/​characterize_vswitch_performance_for_telco_nfv_use_cases ​
 +
 +**TOIT**
 +  * Code is being cleaned up and prep'​ed for release
 +  * Slides to be sent out by Stephen
 +  * Feedback given that tests should have a configurable duration.
 +
 +Admin/​Infrastructure point of contact for the project: Maryam Tahhan
 +  ​
 +**Patch reviews**
 +  * One +1 for the intro. Need another committer to +1 to progress that test spec section to the next phase
 +  * Review cycle to be reduced to 2 days rather than 3 days
 +  * Features to be tested patch rework started today by Maryam Tahhan
 +  * Owner column added to patch review wiki (https://​wiki.opnfv.org/​wiki/​vswitchperf_test_spec_review) so that other contributors can also re-work patches.
 +  * Patch reviews and rework should be conducted in the order specified in the table (top to bottom). ​
 +
 +**Project Leader**
 +  * Will need to select one when the selection process is hardened. ​
 +
 +
 +==== Feb/04/2015 ====
 +Minutes:
 +  * Stephen Finucane gave an overview/​demo of TOIT  ​
 +    * TOIT is an OVS test integration framework written in Python that Intel would like to share with the community for re-use ​ for this  project. [Action: Stephen F. to send out slides].
 +    * The framework is generic and licensed under a permissible apache license.
 +    * Right now it supports OVS and IXIA: IxOS and IxNetworks but the framework can be easily extended to include other traffic generators and switches.
 +    * Community feedback was very positive, an initial commit for the phy-phy test cases is to be made to gerrit. [Action: Stephen F.]
 +    * Out of cycle sessions will be setup to walkthrough the code.
 +
 +Project updates:
 +  * Initial code reviews for test spec are open. The test spec has been broken down into sections and committed to gerrit for review. ​
 +    * Question: why not a single commit? Answer: This is to avoid continuous reviewing sections of a doc that we approve. ​
 +    * In an effort to co-ordinate reviews, so sections of the test spec get pushed to gerrit, open reviews will be documented @https://​wiki.opnfv.org/​wiki/​vswitchperf_test_spec_review ​
 +    * The suggested review cycle is 3 Working days.
 +  * Governance model roles for committed and contributor have been updated to the wording from the TSC-Charter (https://​wiki.opnfv.org/​wiki/​vswitchperf_governance_model)
 +  * OPNFV lab HW spec for the project can be found here: https://​wiki.opnfv.org/​wiki/​vswitch_work_environment ​
 +    * Question, what happens if we want to get different NICs…? [Action: Maryam to follow up with Trevor Cooper]
 +  * Tools:
 +    * JIRA has been setup.
 +      * Project name is VSPERF.
 +      * Please make sure you can access the project and can see the associated issues.
 +      * Gerrit now enforces a JIRA tag for commits.
 +  * Opens: ​
 +    * Do we need a separate mailing list?
 +    * It’s difficult to follow the project updates via the current/​generic opnfv-tech-discuss mailing list. [Action: Maryam to follow up with Linux Foundation]
 +  * General Wiki updates:
 +    * Coding Guidelines : OPNFV Coding Guidelines
 +    * OPNFV Developer Resource Page : Getting started with your account, Gerrit and Git
 +    * HW Spec (specified above)
 +    * Open Gerrit reviews (specified above)
 +    * Governance model wording (specified above)
 +  * Open Gerrit review for repo structure (https://​gerrit.opnfv.org/​gerrit/#/​c/​9/​ )
 +    * The repo structure review has received a single +1 from one committer. [Action: A committer to review and if applicable provide a second +1 so the patch can committed to our repo]
  
 ==== Jan/21/2015 ==== ==== Jan/21/2015 ====
Line 38: Line 108:
    * Test spec update:    * Test spec update:
      * The test spec has been updated with Aihua, Srini and Al’s comments. We propose uploading the test spec to Gerrit in sections for review, for e.g. each test will be a separate review in Gerrit. General sections like the intro and methodology will be submitted as one patch.      * The test spec has been updated with Aihua, Srini and Al’s comments. We propose uploading the test spec to Gerrit in sections for review, for e.g. each test will be a separate review in Gerrit. General sections like the intro and methodology will be submitted as one patch.
- 
  
 ==== Jan/14/2015 ==== ==== Jan/14/2015 ====
wiki/vswitch_meeting_minutes.1421934315.txt.gz · Last modified: 2015/01/22 13:45 by Maryam Tahhan