This shows you the differences between two versions of the page.
| Both sides previous revision Previous revision Next revision | Previous revision | ||
|
wiki:vswitch_meeting_minutes [2015/02/05 11:39] Maryam Tahhan [Jan/21/2015] |
wiki:vswitch_meeting_minutes [2015/03/19 11:19] (current) Maryam Tahhan [THIS PAGE HAS BEEN MOVED TO] |
||
|---|---|---|---|
| Line 1: | Line 1: | ||
| - | ====== Vswitch Performance Characterization Meeting Minutes ====== | + | ====== THIS PAGE HAS BEEN MOVED TO ====== |
| + | https://wiki.opnfv.org/meetings/vsperf | ||
| + | ====== Please help move this page ====== | ||
| + | * NOTE: Meeting info pages for each project should be moved to the ''[[/meetings/|https://wiki.opnfv.org/meetings/]]'' folder. | ||
| + | * Do not place meeting related pages under the ''/wiki'' or ''/project-name'' folders. | ||
| + | * ALSO: Project info pages should not be under the ''/wiki'' folder. | ||
| + | * Project related pages should be located under the ''/'' (root) folder. | ||
| + | * To move your page you should create a new page and update this one with a note stating it has been moved. | ||
| ---- | ---- | ||
| + | |||
| + | ====== vSwitch Performance Characterization Meeting Minutes ====== | ||
| + | |||
| + | |||
| + | ---- | ||
| + | |||
| + | ==== Feb/11/2015 ==== | ||
| + | **Mailing List** | ||
| + | |||
| + | * We won't be able to setup a separate mailing list, however we have setup a topic (vswitchperf) under the OPNFV tech discuss mailing list that people can subscribe to. | ||
| + | * This info is available on the project wiki https://wiki.opnfv.org/characterize_vswitch_performance_for_telco_nfv_use_cases | ||
| + | |||
| + | **TOIT** | ||
| + | * Code is being cleaned up and prep'ed for release | ||
| + | * Slides to be sent out by Stephen | ||
| + | * Feedback given that tests should have a configurable duration. | ||
| + | |||
| + | Admin/Infrastructure point of contact for the project: Maryam Tahhan | ||
| + | | ||
| + | **Patch reviews** | ||
| + | * One +1 for the intro. Need another committer to +1 to progress that test spec section to the next phase | ||
| + | * Review cycle to be reduced to 2 days rather than 3 days | ||
| + | * Features to be tested patch rework started today by Maryam Tahhan | ||
| + | * Owner column added to patch review wiki (https://wiki.opnfv.org/wiki/vswitchperf_test_spec_review) so that other contributors can also re-work patches. | ||
| + | * Patch reviews and rework should be conducted in the order specified in the table (top to bottom). | ||
| + | |||
| + | **Project Leader** | ||
| + | * Will need to select one when the selection process is hardened. | ||
| + | |||
| ==== Feb/04/2015 ==== | ==== Feb/04/2015 ==== | ||
| Line 37: | Line 73: | ||
| * Open Gerrit review for repo structure (https://gerrit.opnfv.org/gerrit/#/c/9/ ) | * Open Gerrit review for repo structure (https://gerrit.opnfv.org/gerrit/#/c/9/ ) | ||
| * The repo structure review has received a single +1 from one committer. [Action: A committer to review and if applicable provide a second +1 so the patch can committed to our repo] | * The repo structure review has received a single +1 from one committer. [Action: A committer to review and if applicable provide a second +1 so the patch can committed to our repo] | ||
| - | |||
| ==== Jan/21/2015 ==== | ==== Jan/21/2015 ==== | ||