This is an old revision of the document!
This section lists tasks and activities which "vswitchperf" will develop and execute. It is expected that the output here will fold into higher level OPNFV test projects (e.g. for system level functionality testing, specific VNF use-case tests, performance tests etc.) - which are in the process of being defined.
Feature | Description | Priority | JIRA |
---|---|---|---|
Task | Description | Interested Committers/contributors |
---|---|---|
Test Case Specification | Generic specification (not vSwitch specific, or architecture specific). Requires a lot of work and diverse community involvement as Committers. The Test case specification must be absoutely generic - it may not even refer to any specific vSwitch implementation. This is the intent of the project - generic vSwitch characterization. The project will not prevent the creation of additional test configurations for different vSwitches - whether its kernel based data paths, or user space data paths, etc. | Intel (Maryam Tahhan), Dell (Wenjing Chu), Thomas Graf (Noiro Networks), Mark Lambe (AeroFlex), Christoph Meyer (Ericsson), Aihua Li (Huawei) |
Project Repo Structure | Organize and maintain high level directory tree . | Aihua Li (Hauwei) |
HW Specification | Need to describe the initial HW that can be available for use by this project. Linux Foundation virtual infrastructure probably not sufficient, will need to use the facilties of the OPNFV Performance and Test Lab infrastructure. | Trevor Cooper (Intel) |
Test implementation and integration into framework | Implement test cases into test framework | Intel (Maryam Tahhan), Gene Schneider (Huawei), Madhu Challa (Noiro Networks), Dell (Name to follow from Wenjing), Wang Xiao, Chen Jinzhou ( Huawei ), Christoph Meyer (Ericsson) |