Project Name:

Project description:

Scope:

NFV Use Cases described in ETSI GS NFV 001 show a large variety of applications, each defining specific requirements and complex configuration on the underlying infrastructure and test tools. Instead of using one test-VNF application, this project aims at decomposing typical VNF work-load performance metrics into a number of characteristics/performance vectors, which each of them can be represented by distinct test-cases. This approach gives traceable results, thereby providing good fault isolation and flexibility in adding new test cases when a new challenge is identified.

The metrics shall be divided into categories, such as:

The test cases might be combined and run in paralel, enabling:

The proposed methodology includes:

This project will develop additional functionality to the base system testing covered by the project "Functest", such as metrics, parallel testing, fault injection, multiple topologies, scenario testing, enabling verification of more complex test cases.

This project proposes to contribute a first implementation for evaluation, which:

Candidates for functionality to be developed:

Presentation

yardstick_proposal.pptx

Testability:

Dependencies:

Committers and Contributors:

Planned deliverables

Proposed Release Schedule: