User Tools

Site Tools


collaborative_development_projects:rescuer

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
collaborative_development_projects:rescuer [2015/04/10 07:18]
Zhipeng (Howard) Huang
collaborative_development_projects:rescuer [2015/04/10 07:19] (current)
Zhipeng (Howard) Huang
Line 7: Line 7:
 ==== Project description:​ ==== ==== Project description:​ ====
  
-Disaster Recovery (DR) is a very important issue in NFV, for example when dealing with burst hours during holidays , shut down or malfunction of a VIM instance or even a complete site may cause severe service interruption,​ or a complete service termination. without a strong infrastructure level disaster recovery support. Therefore this project is proposed to develop use cases, requirements,​ as well as upstream project blue prints, ​focusing ​on how to make infrastructure DR-capable to keep the service continuity ​to meet the requirement defined by the terms like RPO or RTO when extreme scenario strikes. ​+Disaster Recovery (DR) is a very important issue in NFV, for example when dealing with burst hours during holidays , shut down or malfunction of a VIM instance or even a complete site may cause severe service interruption,​ or a complete service termination. without a strong infrastructure level disaster recovery support. Therefore this project is proposed to develop use cases, requirements,​ as well as upstream project blue prints, ​with focus on how to make infrastructure DR-capable to keep the service continuity meet the requirement defined by the terms like RPO or RTO when extreme scenario strikes. ​
  
 === ETSI NFV Requirements === === ETSI NFV Requirements ===
collaborative_development_projects/rescuer.1428650313.txt.gz · Last modified: 2015/04/10 07:18 by Zhipeng (Howard) Huang