Line 7: Line 7:
 ==== Project description:​ ==== ==== Project description:​ ====
  
-Disaster Recovery (DR) is a very important issue in NFV, as when a VIM instance or even a complete site goes downwe need a strong DR scheme ​to keep the service continuity ​to meet the requirement defined by the terms like RPO or RTO.+Disaster Recovery (DR) is a very important issue in NFV, for example ​when dealing with burst hours during holidays , shut down or malfunction of a VIM instance or even a complete site may cause severe service interruptionor a complete service termination. without ​a strong ​infrastructure level disaster recovery support. Therefore this project is proposed to develop use cases, requirements,​ as well as upstream project blue prints, with focus on how to make infrastructure ​DR-capable ​to keep the service continuity meet the requirement defined by the terms like RPO or RTO when extreme scenario strikes
  
 === ETSI NFV Requirements === === ETSI NFV Requirements ===
Line 46: Line 46:
   * ''​Describe the problem being solved by project''​   * ''​Describe the problem being solved by project''​
  
-The project aims to develop the requirements for NFVI and VIM on supporting Telco grade DR implementation ​which covers ​+The project aims to develop the requirements ​and use cases for NFVI and VIM on supporting Telco grade DR implementation : 
-  * Requirements for VIM and NFVI to support ​Single Site DR, including ​both active-active ​and active-standby design + 
-  * Requirements for VIM and NFVI to support Multisite ​DR, including both active-active ​and active-standby design+  * Requirements for VIM and NFVI to support ​Multisite ​DR, including
 + 
 +    a. For active-activeactive-hot standby, active-cold ​standby design 
 +    b. Replication of all configuration ​and metadata required by an application - Neutron, Cinder, Nova, etc. 
 +    c. Ability ​to ensure consistency of the replicated data & metadata 
 +    d. Supporting a wide range of data replication methods: Storage systems based replication,​ Hypervisor assisted (possibly between heterogeneous storage systems). For example, using DRBD or Qemu based replication,​ Backup and Restore methods, Pluggable application level replication methods 
 + 
 +  * DR Use Cases to provide more requirements. 
 +  * Formulate BPs that would reflect the requirements, and implement those BPs in the upstream community.
   * ..   * ..
  
-The requirements would cover DR for compute, storage and network.+
  
   * ''​Specify any interface/​API specification proposed''​   * ''​Specify any interface/​API specification proposed''​
Line 72: Line 80:
  
 This project is extendable for future functions. This project is extendable for future functions.
- 
 ==== Testability:​ ''​(optional,​ Project Categories: Integration & Testing)''​ ==== ==== Testability:​ ''​(optional,​ Project Categories: Integration & Testing)''​ ====
  
Line 89: Line 96:
   * ''​Identify similar projects is underway or being proposed in OPNFV or upstream project''​   * ''​Identify similar projects is underway or being proposed in OPNFV or upstream project''​
  
-OPNFV Multisite.+OPNFVMultisite, HA For VNF, Doctor.
  
   * ''​Identify any open source upstream projects and release timeline.''​   * ''​Identify any open source upstream projects and release timeline.''​