This shows you the differences between two versions of the page.
ipv6_opnfv_project:minutes_20150206 [2015/02/09 22:29] Bin Hu created |
ipv6_opnfv_project:minutes_20150206 [2015/02/13 15:22] (current) Sridhar Gaddam |
||
---|---|---|---|
Line 9: | Line 9: | ||
* Mark Medina (ClearPath) | * Mark Medina (ClearPath) | ||
* Peter Lee (ClearPath) | * Peter Lee (ClearPath) | ||
- | * Sridha Gaddam (RedHat) | + | * Sridhar Gaddam (RedHat) |
* Status Update. | * Status Update. | ||
Line 15: | Line 15: | ||
* Using a VM as the IPv6 Router to address Neutron Shortcomings | * Using a VM as the IPv6 Router to address Neutron Shortcomings | ||
* Contribution to Neutron Development with RADVD | * Contribution to Neutron Development with RADVD | ||
- | * Sridha had some comments on the first scenario of "Using a VM as the IPv6 Router to address Neutron Shortcomings". Mark agreed and needed some more time to further consider Sridha's suggestions | + | * Sridhar had some comments on the first scenario of "Using a VM as the IPv6 Router to address Neutron Shortcomings". Mark agreed and needed some more time to further consider Sridha's suggestions |
- | * Sridha also commented that the second scenario is what Neutron is doing | + | * Sridhar also commented that the second scenario is what Neutron is doing |
* Peter clarified that Jonne is doing some research in the Router Namespace of RADVD. His research outcome could be a potential contribution to Neutron | * Peter clarified that Jonne is doing some research in the Router Namespace of RADVD. His research outcome could be a potential contribution to Neutron | ||
- | * Bin summarized the use case and gap analysis. Sridha suggested that we can have one more column to link to existing Blueprints and/or other references. | + | * Bin summarized the use case and gap analysis. Sridhar suggested that we can have one more column to link to existing Blueprints and/or other references. |
* Jonne gave offline update to Bin with regard to his 3 actions | * Jonne gave offline update to Bin with regard to his 3 actions | ||
* Next Steps / New Actions | * Next Steps / New Actions | ||
* Mark will polish the first PoC scenario, and make revisions accordingly. | * Mark will polish the first PoC scenario, and make revisions accordingly. | ||
- | * Sridha will review use case and gap analysis, and PoC design offline, and will revise it accordingly | + | * Sridhar will review use case and gap analysis, and PoC design offline, and will revise it accordingly |
* Prior Actions: | * Prior Actions: |