User Tools

Site Tools


meetings:dt_minutes_20160128

Minutes of DoveTail Discussion on January 29, 2016

  • Date and Time: 6:00am PST / UTC 14:00, Friday January 29, 2016
  • Convener: Hongbo (Huawei) and Bin Hu(AT&T)
  • Participants:
    • Ashok Emani (Intel)
    • Brian Smith (Bell Canada)
    • Christopher Price (Ericsson)
    • Debra Scott (OPNFV)
    • Heather Kirksey (OPNFV)
    • Howard (Zhipeng) Huang (Huawei)
    • Lincoln Lavoie (UNH)
    • Mika Rautakumpu (Nokia)
    • Raymond Paik (OPNFV)
    • Tapio Tallgren (Nokia)
    • Tetsuya Nakamura (CableLabs)
    • Trevor Cooper (Intel)
    • Xiaoli Wang (Huawei)
    • Yaoguang Wang (Huawei)

Agenda:

MeetBot Minutes

Agreement

  • Scope as outlined on Slide #3 of Plugfest Scope and Project Planning
    • Validation of installation process on different hardware platforms and configurations
    • Validation of SDN controller integration, coupled with install process testing above.
    • (Lower Priority) Verify the life cycle management on the OPNFV platform
      • Testing of the application is outside of the scope of this event.
  • Test Suites and all technical work from OPNFV Dovetail/PlugFest repository
  • Timeline as outlined on Slide #5 of Plugfest Scope and Project Planning

Action Item

  • Lincoln to establish PlugFest wiki and draft the scope of PlugFest and high level test plan for group to discuss next time
  • Lincoln to work with Ray to polish details and finalize ROE
meetings/dt_minutes_20160128.txt · Last modified: 2016/01/30 17:27 by Bin Hu