Previous revision
meetings:dt_minutes_20160128 [2016/01/30 17:12]
Bin Hu
meetings:dt_minutes_20160128 [2016/01/30 17:27] (current)
Bin Hu
Line 29: Line 29:
 === MeetBot Minutes === === MeetBot Minutes ===
 [[http://​ircbot.wl.linuxfoundation.org/​meetings/​opnfv-meeting/​2016/​opnfv-meeting.2016-01-29-14.05.html]] [[http://​ircbot.wl.linuxfoundation.org/​meetings/​opnfv-meeting/​2016/​opnfv-meeting.2016-01-29-14.05.html]]
 +
 +=== Agreement ===
 +
 +  * **Scope** as outlined on Slide #3 of {{:​projects:​opnfv_plugfest_planning_january-29-2016.pptx|Plugfest Scope and Project Planning}}
 +    * Validation of installation process on different hardware platforms and configurations
 +    * Validation of SDN controller integration,​ coupled with install process testing above.
 +    * (Lower Priority) Verify the life cycle management on the OPNFV platform
 +      * Testing of the application is outside of the scope of this event.
 +  * **Test Suites and all technical work** from OPNFV Dovetail/​PlugFest repository
 +  * **Timeline** as outlined on Slide #5 of {{:​projects:​opnfv_plugfest_planning_january-29-2016.pptx|Plugfest Scope and Project Planning}}
 +
 +=== Action Item ===
 +
 +  * **Lincoln** to establish PlugFest wiki and draft the scope of PlugFest and high level test plan for group to discuss next time
 +  * **Lincoln** to work with Ray to polish details and finalize ROE
 +