Bin Hu
Line 37: Line 37:
     * (Lower Priority) Verify the life cycle management on the OPNFV platform     * (Lower Priority) Verify the life cycle management on the OPNFV platform
       * Testing of the application is outside of the scope of this event.       * Testing of the application is outside of the scope of this event.
-  * **Test Suites** from OPNFV Dovetail/​PlugFest repository+  * **Test Suites ​and all technical work** from OPNFV Dovetail/​PlugFest repository
   * **Timeline** as outlined on Slide #5 of {{:​projects:​opnfv_plugfest_planning_january-29-2016.pptx|Plugfest Scope and Project Planning}}   * **Timeline** as outlined on Slide #5 of {{:​projects:​opnfv_plugfest_planning_january-29-2016.pptx|Plugfest Scope and Project Planning}}
  
 === Action Item === === Action Item ===
  
-  * **Lincoln** to draft the scope of PlugFest and high level test plan for group to discuss next time+  * **Lincoln** to establish PlugFest wiki and draft the scope of PlugFest and high level test plan for group to discuss next time
   * **Lincoln** to work with Ray to polish details and finalize ROE   * **Lincoln** to work with Ray to polish details and finalize ROE
  