This shows you the differences between two versions of the page.
| Both sides previous revision Previous revision Next revision | Previous revision | ||
|
meetings:dt_minutes_20160128 [2016/01/30 17:23] Bin Hu |
meetings:dt_minutes_20160128 [2016/01/30 17:27] (current) Bin Hu |
||
|---|---|---|---|
| Line 37: | Line 37: | ||
| * (Lower Priority) Verify the life cycle management on the OPNFV platform | * (Lower Priority) Verify the life cycle management on the OPNFV platform | ||
| * Testing of the application is outside of the scope of this event. | * Testing of the application is outside of the scope of this event. | ||
| - | * **Test Suites** from OPNFV Dovetail/PlugFest repository | + | * **Test Suites and all technical work** from OPNFV Dovetail/PlugFest repository |
| * **Timeline** as outlined on Slide #5 of {{:projects:opnfv_plugfest_planning_january-29-2016.pptx|Plugfest Scope and Project Planning}} | * **Timeline** as outlined on Slide #5 of {{:projects:opnfv_plugfest_planning_january-29-2016.pptx|Plugfest Scope and Project Planning}} | ||
| === Action Item === | === Action Item === | ||
| - | * **Lincoln** to draft the scope of PlugFest and high level test plan for group to discuss next time | + | * **Lincoln** to establish PlugFest wiki and draft the scope of PlugFest and high level test plan for group to discuss next time |
| * **Lincoln** to work with Ray to polish details and finalize ROE | * **Lincoln** to work with Ray to polish details and finalize ROE | ||