User Tools

Site Tools


pinpoint:pinpoint_project_proposal

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
pinpoint:pinpoint_project_proposal [2015/08/04 12:23]
Adi Molkho [Dependencies:]
pinpoint:pinpoint_project_proposal [2015/08/18 05:36] (current)
Adi Molkho
Line 10: Line 10:
   * Fault localization also identify performance bottlenecks easily revealing the true source of the various symptoms ​   * Fault localization also identify performance bottlenecks easily revealing the true source of the various symptoms ​
   * Fault localization is also known as fault isolation, alarm/event correlation,​ and root cause analysis (RCA).   * Fault localization is also known as fault isolation, alarm/event correlation,​ and root cause analysis (RCA).
 +
 +
 +{{ :​pinpoint:​2.png?​nolink |}}
 +
  
 ==== Scope: ==== ==== Scope: ====
Line 25: Line 29:
   * The project is related to the: Onos and ODL project as it may use some of their APIs   * The project is related to the: Onos and ODL project as it may use some of their APIs
   * The project is aligned with an activity in IETF LIME group to provide generic model for technology agnostic network OAM  ​   * The project is aligned with an activity in IETF LIME group to provide generic model for technology agnostic network OAM  ​
 +
 ==== Committers and Contributors:​ ==== ==== Committers and Contributors:​ ====
  
Line 37: Line 42:
     Adam Itshar (Huawei: adam.itshar@huawei.com)     Adam Itshar (Huawei: adam.itshar@huawei.com)
     Zhouxingwang (Joe)  (Huawei: zhouxingwang@huawei.com )     Zhouxingwang (Joe)  (Huawei: zhouxingwang@huawei.com )
 +    Zhipeng Huang (Huawei: zhipengh512@gmail.com)
  
 ==== Planned deliverables ==== ==== Planned deliverables ====
Line 42: Line 48:
   * User requirements of OPNFV fault localization.   * User requirements of OPNFV fault localization.
   * Gap analysis on fault localization APIs with open source upstream projects.   * Gap analysis on fault localization APIs with open source upstream projects.
-  * Propose BPs in OpenStack according to gaps found in the analysis.+  * Propose BPs in OpenStack ​projects, Onos and ODL according to gaps found in the analysis.
  
 ==== Proposed Release Schedule: ==== ==== Proposed Release Schedule: ====
  
-  * When is the first release ​planned? +  * Planned for OPNFV release ​3
-  * Will this align with the current release cadence+
  
  
-Use the above information to create a key project facts section on your project page 
 ===== Key Project Facts ===== ===== Key Project Facts =====
  
-** Project Name: ** Project Name (repo name) \\ +** Project Name: ** Pinpoint ​\\ 
-** Repo name: ** \\ +** Repo name: ** pinpoint\\ 
-** Project Category: ** \\ +** Project Category: ** Requirements\\ 
-** Lifecycle State: ** \\ +** Lifecycle State: ** Proposal ​\\ 
-** Primary Contact: ** \\ +** Primary Contact: ** Adi molkho adi.molkho@huawei.com\\ 
-** Project Lead: ** \\+** Project Lead: ** Adi molkho adi.molkho@huawei.com\\
 ** Jira Project Name: ** Same as Project name \\ ** Jira Project Name: ** Same as Project name \\
-** Jira Project Prefix: ** [10 Characters max [A-Z] ] \\ +** Jira Project Prefix: ** PNT \\ 
-** mailing list tag ** [Should match Jira Project Prefix] ​\\+** mailing list tag ** PNT_pinpoint ​\\
 ** Committers: ** \\ ** Committers: ** \\
-foo@bar.com \\ +adi.molkho@huawei.com \\ 
-baz@qux.com \\ +mishael.wexler@huawei.com \\
-** Link to TSC approval: Example http://​meetbot.opnfv.org/​meetings/​opnfv-meeting/​2015/​opnfv-meeting.2015-03-03-15.01.html ** \\  +
-** Link to approval of additional submitters: ** Example http://​meetbot.opnfv.org/​meetings/​opnfv-meeting/​2015/​opnfv-meeting.2015-03-03-15.01.html \\ +
pinpoint/pinpoint_project_proposal.1438691008.txt.gz · Last modified: 2015/08/04 12:23 by Adi Molkho