User Tools

Site Tools


project_proposals:vaccine

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
project_proposals:vaccine [2015/09/02 08:00]
Rex Lee [Project description:]
project_proposals:vaccine [2015/09/17 11:53] (current)
Ryota Mibu [Committers and Contributors:]
Line 23: Line 23:
   * Test tools: integrate/​develop reliability test tools. For realizing the reliability test measures and metrics and running test cases, some open source tools for reliability test will be firstly integrated and additional tools will be developed.   * Test tools: integrate/​develop reliability test tools. For realizing the reliability test measures and metrics and running test cases, some open source tools for reliability test will be firstly integrated and additional tools will be developed.
  
 +This project initially focuses on the following components: ​
 +  * Hardware
 +  * Hypervisor
 +  * VM
 +  * VIM
 ==== Testability: ​ ==== ==== Testability: ​ ====
  
Line 34: Line 39:
   * “Bottlenecks” provides the workload tools for verifying the reliability of infrastructure under load.   * “Bottlenecks” provides the workload tools for verifying the reliability of infrastructure under load.
   * “Yardstick” provides some test stimuli tools for infrastructure verification.   * “Yardstick” provides some test stimuli tools for infrastructure verification.
-  * This project collects test scenarios from “Doctor“ HA“ Prediction” as input of reliability test cases+  * This project collects test scenarios from “Doctor/​HA/​Multisite/​Pinpoint/​Prediction” as input of reliability test cases
   * This project takes the standard of ETSI ISG NFV as input, and intends to work with other related industry forums including but not limited to CQR working group.   * This project takes the standard of ETSI ISG NFV as input, and intends to work with other related industry forums including but not limited to CQR working group.
  
Line 40: Line 45:
  
   * Names and affiliations of the committers   * Names and affiliations of the committers
- +    * Yimin Wang (Huawei: ​<yimin.wang@huawei.com>
-    ​Yimin Wang (Huawei: yimin.wang@huawei.com) +    ​* Qiao Fu (China Mobile: <​fuqiao@chinamobile.com>​) 
-    Mingjiang ​ Li (Huawei: limingjiang@huawei.com) +    * Mingjiang ​ Li (Huawei: ​<limingjiang@huawei.com>
-    Cuiqin Li (Huawei: licuiqin@huawei.com)+    ​Cuiqin Li (Huawei: ​<licuiqin@huawei.com>) 
 +    * Ryota Mibu (NEC: <​r-mibu@cq.jp.nec.com>​)
  
   * Names and affiliations of any other contributors   * Names and affiliations of any other contributors
- +    * Hao Pang (Huawei: ​<shamrock.pang@huawei.com>
-    ​Hao Pang (Huawei: shamrock.pang@huawei.com) +    ​Hongbo Tian (Huawei: ​<hongbo.tianhongbo@huawei.com>
-    Hongbo Tian (Huawei: hongbo.tianhongbo@huawei.com) +    ​Xiao Wang (Huawei: ​<randy.wang@huawei.com>
-    Xiao Wang (Huawei: randy.wang@huawei.com) +    ​Canfu Zeng (Huawei: ​<zengcanfu@huawei.com>)
-    Canfu Zeng (Huawei: zengcanfu@huawei.com)+
 ==== Planned deliverables ==== ==== Planned deliverables ====
  
Line 59: Line 64:
 ==== Proposed Release Schedule: ==== ==== Proposed Release Schedule: ====
  
-  * Further development will aligned ​with OPNFV'​s ​release cadence +  * Further development will align with release cadence ​of OPNFV 
-  * Intends to participate in the Brahmaputra release providing ​ test case examples and test demo+  * Intends to participate in the Brahmaputra releaseproviding test case examples and test demo
  
 ===== Key Project Facts ===== ===== Key Project Facts =====
Line 68: Line 73:
 ** Project Category: ** Integration & Testing\\ ** Project Category: ** Integration & Testing\\
 ** Lifecycle State: ** Proposal\\ ** Lifecycle State: ** Proposal\\
-** Primary Contact: ** xiaoli.wang@huawei.com\\ +** Primary Contact: ** <xiaoli.wang@huawei.com>\\ 
-** Project Lead: ** xiaoli.wang@huawei.com\\+** Project Lead: ** Xiaoli Wang\\
 ** Jira Project Name: ** Vaccine \\ ** Jira Project Name: ** Vaccine \\
 ** Jira Project Prefix: ** [vaccine] \\ ** Jira Project Prefix: ** [vaccine] \\
 ** mailing list tag ** [vaccine] \\ ** mailing list tag ** [vaccine] \\
project_proposals/vaccine.1441180834.txt.gz · Last modified: 2015/09/02 08:00 by Rex Lee