User Tools

Site Tools


releases:brahmaputra:release_plan:genesis_milestone_d_report

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
releases:brahmaputra:release_plan:genesis_milestone_d_report [2015/11/30 10:58]
Frank Brockners
releases:brahmaputra:release_plan:genesis_milestone_d_report [2015/11/30 16:06] (current)
Frank Brockners
Line 1: Line 1:
-Genesis Milestone D Report+====== ​Genesis Milestone D Report ​======
  
-1. If you have code are features frozen? y 
  
-2. If you have api/s, files or other interfaces that other projects rely on to integrate with your project ​are they frozen? ​na (that said, Genesis defines and implements common configuration files for all installers. A draft is found at: [[https://​gerrit.opnfv.org/gerrit/#/c/3583]]+1. If you have code are features ​frozen? ​\\ //yes//
  
-3Are your test specifications ​frozen ​and provided to test projectsNo additional use cases can be added to the release after this milestone ​(iefeature projects have added the test cases for their project to the test team suite) na+2If you have api/s, files or other interfaces that other projects rely on to integrate with your project are they frozen? ​\\ //not applicable ​(that said, Genesis defines and implements common configuration files for all installersA draft is found at: [[https://​gerrit.opnfv.org/​gerrit/#/​c/​3583]]//​
  
-4If you require post-install processing have you consulted with CI (Octopus), CD (Releng), ​and/or companion ​test projects ​(functest, yardstick, etc) regarding scripts you may need to provide such as for install, set-env, run-test, clean-env? na+3Are your test specifications frozen ​and provided to test projects? No additional use cases can be added to the release after this milestone (ie. feature projects have added the test cases for their project to the test team suite) \\ //not applicable//​
  
-5. If you have no code(e.g. documentation projects) - drafts of all deliverables exist and are ready for first review? ​y+4. If you require post-install processing have you consulted with CI (Octopus), CD (Releng), and/or companion test projects (functest, yardstick, etc) regarding scripts you may need to provide such as for install, set-env, run-test, clean-env? \\ //not applicable//​ 
 + 
 +5. If you have no code(e.g. documentation projects) - drafts of all deliverables exist and are ready for first review? ​\\ //yes//
  
 6. List/​describe your progress to date 6. List/​describe your progress to date
Line 21: Line 22:
   * Finalize common configuration files format.   * Finalize common configuration files format.
  
-8. How confident are you that you will be complete for Milestone E/code freeze on Jan 5? Green+8. How confident are you that you will be complete for Milestone E/code freeze on Jan 5? \\ //Green//
  
-9. List any serious or blocking issues that are impeding progress on your project: ​na+9. List any serious or blocking issues that are impeding progress on your project: ​\\ //not applicable//​
releases/brahmaputra/release_plan/genesis_milestone_d_report.1448881126.txt.gz · Last modified: 2015/11/30 10:58 by Frank Brockners