 SFC Milestone D Report SFC Milestone D Report
- 
-1. If you have code are features frozen? y/n/na 
- 
-2. If you have api/s, files or other interfaces that other projects rely on to integrate with your project are they frozen? y/n/na 
- 
-3. Are your test specifications frozen and provided to test projects? No additional use cases can be added to the release after this milestone (ie. feature projects have added the test cases for their project to the test team suite) y/n/na 
- 
-4. If you require post-install processing have you consulted with CI (Octopus), CD (Releng), and/or companion test projects (functest, yardstick, etc) regarding scripts you may need to provide such as for install, set-env, run-test, clean-env? 
- 
-5. If you have no code(e.g. documentation projects) - drafts of all deliverables exist and are ready for first review? y/n/na 
- 
-6. List/​describe your progress to date? 
- 
-7. Describe what you have remaining to do? (hint: You should only have completion of existing features and bug fixes to do. For test projects you will be developing remaining tests according to frozen specifications.) 
- 
-8. How confident are you that you will be complete for Milestone E/code freeze on Jan 5? Green/​Yellow/​Red 
- 
-9. List any serious or blocking issues that are impeding progress on your project: 
- 
  
 |Item|Question|Answer| |Item|Question|Answer|
-|1 | If you have code are features frozen? | (NYardstick code development must continue, to support the test specifications ​in point 3which are frozen by Dec 1st+|1 | If you have code are features frozen? | (YThe Upstream ODL SFC project scope was frozen ​in Milestone M3 on October 152015. 
-|2 | If you have api/s, files or other interfaces that other projects rely on to integrate with your project are they frozen? | (N) Other projects ​will use Yardstick framework to execute test casesThe framework code is not frozen+|2 | If you have api/s, files or other interfaces that other projects rely on to integrate with your project are they frozen? | (N) There are no OPNFV SFC APIs used by other projects. | 
-|3 | Are your test specifications frozen and provided to test projects? No additional use cases can be added to the release after this milestone (ie. feature projects have added the test cases for their project to the test team suite) | (Y) However, there is remaining work to detail the test specifications+|3 | Are your test specifications frozen and provided to test projects? No additional use cases can be added to the release after this milestone (ie. feature projects have added the test cases for their project to the test team suite) | (Y) We have been working closely with Yardstick and Functest.
-|4 | If you require post-install processing have you consulted with CI (Octopus), CD (Releng), and/or companion test projects (functest, yardstick, etc) regarding scripts you may need to provide such as for install, set-env, run-test, clean-env?| (Y) |+|4 | If you require post-install processing have you consulted with CI (Octopus), CD (Releng), and/or companion test projects (functest, yardstick, etc) regarding scripts you may need to provide such as for install, set-env, run-test, clean-env?| (NNot yet, its still not sure if we will have to install Tacker in our post-install. I sent a heads-up email to the Functest, Yardstick, and Releng contacts ​|
 |5 | If you have no code(e.g. documentation projects) - drafts of all deliverables exist and are ready for first review? | (NA) | |5 | If you have no code(e.g. documentation projects) - drafts of all deliverables exist and are ready for first review? | (NA) |
-|6 | List/​describe your progress to date? | Deploy Yardstick in 5 community labs, start executing test cases, implement test result API in framework, evolve Yardstick framework architecture and develop Yardstick framework ​to cater for companion projectsmore details ​in Jira.| +|6 | List/​describe your progress to date? | We have been able to create a Service Chain and necessary Service Function (SF) VMs from Tacker and pass packets through the chain and SF VMs. This was using NetVirt as a classifierand the App-coexistence mentioned ​in number 7 below was hard-coded.| 
-|7 | Describe what you have remaining to do? (hint: You should only have completion of existing features and bug fixes to do. For test projects you will be developing remaining tests according to frozen specifications.)| ​Develop framework code to cater for all the test specifications;​ Set up all labs required for the tests and releaseenable tests; Collect, verify and visualize test results; Documentation;​ Bug fixes| +|7 | Describe what you have remaining to do? (hint: You should only have completion of existing features and bug fixes to do. For test projects you will be developing remaining tests according to frozen specifications.)| ​In upstream ODL SFC we still have to finish App Co-existence,​ whereby multiple apps can write to the same OpenFlow switch. We also have to finish ​the Abstract Data Types ODL SFC APIwhereby Tacker can request a chain be created with an abstract list of Service Function Types; Documentation;​ Bug fixes| 
-|8 | How confident are you that you will be complete for Milestone E/code freeze on Jan 5? Green/​Yellow/​Red|Yellow2Red ​Not all test cases, including Yardstick own test cases, will be ready by Jan 5th. | +|8 | How confident are you that you will be complete for Milestone E/code freeze on Jan 5? Green/​Yellow/​Red|Yellow ​Pending completion of the items in number 7 and results of testing. | 
-|9 | List any serious or blocking issues that are impeding progress on your project| ​As mentioned in milestone Cneed decision (and freeze it) which labs will be used for release verification;​ Christmas holidays will slow things down before next milestone| +|9 | List any serious or blocking issues that are impeding progress on your project| ​The upstream OVS NSH patch is taking too long to finishbut we have work-around in place where SFF to SF packets first go to the local IP stack for VXLAN encapsulation,​ and are then sent back into the switch. Then the packets are handled as normal IP/UDP packets and sent to the Service Function.|
- +