This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision | ||
releng [2015/08/14 09:21] Fatih Degirmenci |
releng [2016/02/16 14:52] (current) Fatih Degirmenci |
||
---|---|---|---|
Line 8: | Line 8: | ||
The scope of Release Engineering project includes | The scope of Release Engineering project includes | ||
- | * collecting requirements from all OPNFV projects and analyze them | + | * collecting requirements from all OPNFV projects regarding automation and tooling, analyzes, and realizes them |
- | * putting requirements on all OPNFV projects to make sure solutions are common to all | + | * putting requirements on all OPNFV projects to make sure solutions are as common as possible to all projects |
* creating scripts and Jenkins jobs in order to automate what can be automated | * creating scripts and Jenkins jobs in order to automate what can be automated | ||
- | * evaluating and setting up the tools that are needed | + | * evaluating and setting up, and maintaining the tools that are needed by the community |
* providing software infrastructure support with regards to tools, scripts, and Jenkins jobs | * providing software infrastructure support with regards to tools, scripts, and Jenkins jobs | ||
* guiding OPNFV community with automation tasks | * guiding OPNFV community with automation tasks | ||
Line 20: | Line 20: | ||
===== Meetings ===== | ===== Meetings ===== | ||
- | **When:** Weekly on Monday at [[http://www.timeanddate.com/worldclock/fixedtime.html?hour=14&min=0&sec=0|14:00-15:00]] UTC \\ | + | Releng project does not have standing meetings. All the committers and contributors can be reached via IRC on different OPNFV channels. |
- | **IRC channel:** #opnfv-meeting@Freenode \\ | + | |
- | **Details:** [[meetings/releng|meetings/releng]] for upcoming agenda, previous meetings | + | |
- | + | ||
- | Please note that the meeting is IRC-only. | + | |
===== Way of Working ===== | ===== Way of Working ===== | ||
Line 32: | Line 28: | ||
* A change to releng repo must have at least one +2 from any committer but the owner before it can be submitted to master. | * A change to releng repo must have at least one +2 from any committer but the owner before it can be submitted to master. | ||
* A change to releng repo can be submitted whenever it fulfils the submit rule above. | * A change to releng repo can be submitted whenever it fulfils the submit rule above. | ||
- | * Releng Team holds weekly team meetings. | + | * Releng Team holds weekly team meetings every Monday, 14:00-15:00 UTC. |
- | * Releng Team uses same meeting time/channel as Octopus Team. | + | * Releng Team uses #opnfv-octopus@Freenode chatroom for day to day communication/collaboration. |
- | * Releng Team uses #opnfv-octopus@Freenode chatroom. | + | |
Please see the survey results from [[https://www.surveymonkey.com/results/SM-RVY9SFFY/|this link]]. | Please see the survey results from [[https://www.surveymonkey.com/results/SM-RVY9SFFY/|this link]]. | ||
+ | |||
+ | ===== Contributions to OpenStack ===== | ||
+ | |||
+ | Releng Project has been contributing to OpenStack Infra in order to patch missing functionality and use it in OPNFV. | ||
+ | |||
+ | Please see the details and accepted/merged commits on below table. | ||
+ | |||
+ | ^ Component ^ Subject ^ Is in use by OPNFV? | | ||
+ | | Jenkins Job Builder | [[https://review.openstack.org/#/c/202056/| Add support for forbidden file paths in gerrit trigger]] | Yes | | ||
+ | | Jenkins Job Builder | [[https://review.openstack.org/#/c/202180/| Validate and set compare types in gerrit trigger]] | Yes | | ||
+ | | Jenkins Job Builder | [[https://review.openstack.org/#/c/192397/| Add Google Cloud Storage Plugin support]] | No | | ||
+ | | Jenkins Job Builder | [[https://review.openstack.org/#/c/192720/| Add Disable Failed Job Plugin support]] | No | | ||
+ | | Jenkins Job Builder | [[https://review.openstack.org/#/c/163149/| Pass through git revision to triggered jobs]] | Yes | | ||
+ | |||
+ | |||
===== Key Project Facts ===== | ===== Key Project Facts ===== |