User Tools

Site Tools


resource_scheduler

This is an old revision of the document!


Project: Resource Scheduler (RS)

Introduction

For telecom applications, the resource scheduler needs much more information of network for resource allocation besides CPU and memory data. Upstream project OpenStack is short of functions to moniter and collect information from network for many applications. To make better use of resources, This project would collect more network information, do resource isolation and make Enhanced Scheduler to allocate resources more efficiently.


Communication Channels

  • IRC: TBD
  • Mailing List: no dedicated mailing list - use opnfv-tech-discuss and tag your emails with [RS] in the subject for easier filtering
  • Meetings : TBD

Work Spaces

  • TBD

Key Project Facts

Project Creation Date: March 10, 2015
Project Category: Requirements
Lifecycle State: Incubation
Primary Contact: Mingjiang Li
Project Lead: Mingjiang Li
Jira Project Name: Resource Scheduler
Jira Project Prefix: RS
Mailing list tag [RS]

Committers and Contributors

  • Committers:
    • Haibo Zhang (HUAWEI: zhanghaibo@huawei.com)
    • Ruopeng Wang (HUAWEI: Ruopeng.Wang@huawei.com)
    • Zhiqi Wang (HUAWEI: zhiqi.wang@huawei.com)
    • Ximing Li (HUAWEI: liximing@huawei.com)
    • Qiao Fu (China Mobile: fuqiao@chinamobile.com)
    • Hao Pang(HUAWEI: shamrock.pang@huawei.com)
    • Yimin Wang (HUAWEI: yimin.wang@huawei.com)
    • Qi Liang (HUAWEI: liangqi1@huawei.com)
    • Mingjiang Li (HUAWEI: limingjiang@huawei.com)
  • Contributors:
    • Zhipeng Huang (HUAWEI: huangzhipeng@huawei.com)
    • Kin-Yip Liu (Cavium: Kin-Yip.Liu@caviumnetworks.com)
    • Ryota Mibu (NEC: r-mibu@cq.jp.nec.com)

Project proposal

RS proposal (old version)

resource_scheduler.1426562906.txt.gz · Last modified: 2015/03/17 03:28 by Mingjiang Li