This is an old revision of the document!
Quick links Bottlenecks Jira tasks Bottlenecks documentation |
---|
This project aims to find system bottlenecks by testing and verifying OPNFV infrastructure in a staging environment before committing it to a production environment. Instead of debugging a deployment in production environment, an automatic method for executing benchmarks which plans to validate the deployment during staging is adopted. This project will provide a framework to find the bottlenecks of OPNFV infrastructure. The framework has four components: Workload generator and VNFs (WV), Monitor and Analysis (MA), Deployment and Configuration (DC), Automated Staging (AS). The architecture is as shown here, and the functions of each components are as below.
The scope of Bottlenecks project includes:
Presentation
meeting materials
bottlenecks_project_for_test_meeting_20150820.pptx
Please see the Bottlenecks Project Proposal for more details.
Meeting details:
Goto Meeting :
IRC meeting :
meeting agenda and logs
IRC :
etherpad for version plan :
Lynch Michael A(Intel): michael.a.lynch@intel.com
Qi Liang: liangqi1@huawei.com
Mingjiang Li: limingjiang@huawei.com
Lingli Deng: denglingli@chinamobile.com