User Tools

Site Tools


all_projects

This is an old revision of the document!


Proposed Projects

Approved Projects

This table is to list all the projects approved by the TSC and their currently status.

No Project Description Category Approved Date Status Release Schedule PTL
1 IPV6 IPv6-enabled OPNFV Integration & Testing 2014-11-25 Incubation Bin Hu(AT&T, bh526r@att.com)
2 Doctor Fault Management and Maintenance Requirement 2014-12-2 Incubation Ryota Mibu(r-mibu@cq.jp.nec.com)
3 Promise Resource Reservation Requirement 2014-12-4 Incubation Ravi Chunduru(rchunduru@clearpathnet.com)
4 BGS Bootstrap/Get-Started Integration & Testing 2014-12-9 Developing R1 Frank Brockners(fbrockne@cisco.com)
5 Octopus Continuous Integration Integration & Testing 2014-12-9 Incubation R1 Ulrich Kleber(ulrich.kleber@huawei.com)
6 Copper Virtualized Infrastructure Deployment Policies Requirement 2014-12-9 Incubation unassigned
7 HA High Availability Requirement 2014-12-9 Incubation unassigned
8 vSwitch Characterize vSwitch Performance for Telco Integration & Testing 2014-12-16 Incubation unassigned
9 FPM Software Fastpath Service Quality Metrics Collaborative Development 2014-12-16 Incubation unassigned
10 OSCAR OPNFV System Configuration And Reporting Integration & Testing 2015-1-13 Incubation unassigned
11 Pharos Testbed Infrastructure Integration & Testing 2015-1-13 Deploying R1 for BGS Trevor Copper(trevor.cooper@intel.com)
12 Functest VNF Deployment Functional Testing Integration & Testing 2015-1-20 Incubation Palani Chinnakannan(pals@cisco.com)
13 Qtip Platform Performance Benchmarking Integration & Testing 2015-1-27 Incubation unassigned
14 Parser Deployment Template Translation Integration & Testing 2015-2-3 Incubation Zhipeng(Howard) Huang(huangzhipeng@huawei.com)
15 DPACC Data Plane Acceleration Requirement 2015-2-10 Incubation unassigned
16 Forwarding Graph OpenStack Based VNF Forwarding Graph Requirement 2015-2-17 Incubation unassigned
17 Collector Data Collection For Failure Prediction Requirement 2015-3-3 Incubation unassigned
18 Resource Scheduler Resource Scheduler Collaborative Development 2015-3-10 Incubation unassigned
19 OpnfvDocs OPNFV Documentation Requirement 2015-3-31 Incubation Christopher Price (christopher.price@ericsson.com)
20 Vimbi Model Oriented Virtualization Interface Requirement 2015-4-7 Incubation Tianran Zhou (zhoutianran@huawei.com)
21 Multisite Multisite Virtualized Infrastructure Requirement 2015-4-21 Incubation unassigned
22 Escalator Smooth Upgrader Requirement 2015-4-21 Incubation unassigned
23 Yardstick Yardstick Integration & Testing 2015-4-28 Incubation unassigned
all_projects.1430260471.txt.gz · Last modified: 2015/04/28 22:34 by julien zhang